News Condamine River Road crossing update 29/06/2023 Facebook Twitter Email Pump-powered water diversion and sandbagging at Long Crossing. Pictures: CONTRIBUTED This is what the Condamine River Road Long Crossing site looked like on Monday (26 June) during workSubscribe or log in to read the rest of this content.